You can also choose to use TommieBot, an AI search assistant developed by St. Thomas School of Engineering students and faculty.

Take me to TommieBot
Favorites ()
Apply

Tommie Wind Farm

Project Summary

The Tommie Wind Farm project is a 38-turbine wind energy site design in Minnesota, developed by our University of St. Thomas senior design team for Westwood Professional Services. The project focuses on turbine layout, access road layout, stormwater management, and hydrologic analysis, ensuring compliance with MnDOT and EPA regulations. Using AutoCAD Civil 3D, HydroCAD, and Flo-2D, the team delivered a 30% bid-ready site plan that supports sustainable energy goals while addressing environmental and engineering challenges.

Design Goal

The goal of the Tommie Wind Farm project is to develop a detailed site plan that optimizes wind turbine placement, access road locations, grading, and stormwater management while ensuring environmental and regulatory compliance. Deliverables include a site layout plan set, hydrology report, cost estimation summary, and Google Earth Pro visualization. Using AutoCAD Civil 3D, HydroCAD, and Flo-2D, the design supports efficient construction, long term maintenance, and integration into the existing power grid, by providing a ready-for-bid 30% completion package for project stakeholders.

Design Constraints

  • Code Requirements: The Final design will meet all applicable federal, state, and county code requirements.
  • Useability: The final design must provide an efficient site layout, access road design, and hydrological control system.
  • Permitting: The final design must meet all applicable permitting and environmental regulations.
  • Stakeholders: The final design must fulfill the required purpose for all impacted parties with minimal impact to the surrounding environment and community. 

Download the project summary (PDF file).

Figure 1: Birds-eye view of the wind farm site (outlined in pink) and turbine locations.

Figure 1: Birds-eye view of the wind farm site (outlined in pink) and turbine locations.

Figure 2: Turbine 27 location and access road layout over topographic map.

Figure 2: Turbine 27 location and access road layout over topographic map.